中文 | English
Homepage > Main track records > Domestic Domestic
  • Project Name :Shanghai Changxing - Chongming submarine cable project

    Total investment :null

    Date Time :2011.04

    Introduction:CSCC completed a 48-core submarine cable installation across the Yangtze river between Changxing Island and Chongming Island in 2011. The project was divided into two main parts: 13 km submarine cable with 5 meters burial depth. HDD was adoppted for 1600 meters cable crossing the main embankment of Qingcaosha reservoir. The project completion date was April 30, 2011.

  • Project Name :2010 Indoor Distribution System Engineering in Oriental Sports Center

    Total investment :null

    Date Time :2010.12

    Introduction:The project was composed of Oriental Sports Center and Press Center, using the distribution system to solve the China Mobile GSM900, TD-SCDMA, China Telecom CDMA800 system and the future of 3G interfaces reserved with one cover system. The project completion date was December 31, 2010.

  • Project Name :Supply and Installation project of high and low voltage power distribution system in Suzhou

    Total investment :null

    Date Time :2010.11

    Introduction:The project contains 10KV lining cable engineering, substation construction and 400V low-voltage cable project. The project started in March 2010 and completed in November 2010.

  • Project Name :China Unicom's Dalian - Yantai submarine cable repair project

    Total investment :null

    Date Time :2010.11

    Introduction:41km HA cable was laid and buried between Dalian – Yantai with 70m water depth. The project was completed in November 2010.

  • Project Name :Shanghai Telecom's CDMA wireless network base station project

    Total investment :null

    Date Time :2009.12

    Introduction:The project includes a single tube iron tower construction, angle iron tower construction and the base station equipment installation as well.

  • Project Name :Submarine cable project in Southeast coast area

    Total investment :null

    Date Time :2006.05

    Introduction:14 submarine cables totally 274Km long were installed to connect 14 islands in Zhoushan area. The project started on October 31, 2005 and completed May 8, 2006.

  • Project Name :Submarine cable project from Pingtan Island to Nanri Island

    Total investment :null

    Date Time :2004.08

    Introduction:This project is part of the new trunk line project. The project used a 12 core double armored cable in Fujian Province between Pingtan Island and Nanri Island. The cable is 46.4 km long and 3 meters deep. The project started on June 25, 2004 and completed on August 8, 2004.